![](http://i0.wp.com/www.almanacnews.com/wp-content/uploads/2024/09/RWC_CaltrainCelebration_09_web-1-scaled-1.jpg?fit=1024%2C683&ssl=1)
Fully electrified service on Caltrain began over the weekend, as the agency rolled out its new schedule and fully electric fleet to much fanfare. Celebrations have been ongoing since the agency’s soft rollout of the switch in mid-August.
The post Caltrain kicks off electrification with Peninsula-wide party appeared first on The Almanac.